Draw a plan for K8s deployment of PST at Low PSI and other prototype integration environments (e.g. CSP LOW PSI)

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Data Processing
    • Hide

      Provides a description of the required steps to enable containerised deployment of PST software (including monitoring & control software) at integration facilities.

      Show
      Provides a description of the required steps to enable containerised deployment of PST software (including monitoring & control software) at integration facilities.
    • 1
    • 0
    • 16.5
    • DRAFT
    • SOL: G5 SPO-1765 SPO-1777

    Description

      • Incorporate the design of RECV, SMRB and DSP C++ applications in a k8s deployment
      • Incorporate the design of TANGO device servers and devices
      • Plan for recorded data storage and retrieval

      Attachments

        Structure

          Activity

            People

              A.Noutsos Noutsos, Aristeidis
              a.jameson Andrew Jameson
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0

                Dates