Mid PSI part 2

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI15
    • None
    • Obs Mgt & Controls
    • Hide

      Any outstanding work from PI14 that needs to completed. This includes_:_

      • Receive, unpack, install and test all remaining/outstanding HW equipment when received
      • Design, plan, configure and connect network connections
      • Install and configure outstanding K8s cluster server with CIS hardened OS and MDA SW stack 
      • Install and configure SKA SW defined architecture on K8s cluster
      • Install and configure SKAMPI SW on  K8s cluster
      • Install, configure and network connect 2 x Talon-LRU HW
      • SKAMPI control of 2 x Talon-LRU (via SKAMPI based Mid.CBF control/MCS)
      • Plus any newly discovered work to be undertaken in PI15:

      (to be updated during PI15 Planning):

      Show
      Any outstanding work from PI14 that needs to completed. This includes_:_ Receive, unpack, install and test all remaining/outstanding HW equipment when received Design, plan, configure and connect network connections Install and configure outstanding K8s cluster server with CIS hardened OS and MDA SW stack  Install and configure SKA SW defined architecture on K8s cluster Install and configure SKAMPI SW on  K8s cluster Install, configure and network connect 2 x Talon-LRU HW SKAMPI control of 2 x Talon-LRU (via SKAMPI based Mid.CBF control/MCS) Plus any newly discovered work to be undertaken in PI15: ( to be updated during PI15 Planning):
    • Intra Program
    • 5
    • 5
    • 20
    • 4
    • Team_CIPA
    • Sprint 5
    • Hide
      • Received, unpacked, installed and test all remaining/outstanding HW equipment except Talon HW (not available)
      • Designed, planned, configured and connected network connections
      • Installed and configured outstanding K8s cluster server with CIS hardened OS and MDA SW stack

      The following items were not completed due to hardware unavailability and installation delays:

      • Install and configure SKA SW defined architecture on K8s cluster – PARTIALLY COMPLETED
      • Install and configure SKAMPI SW on K8s cluster – NOT STARTED
      • Install, configure and network connect 2 x Talon-LRU HW – NOT STARTED (Talon hardware unavailable)
      • SKAMPI control of 2 x Talon-LRU (via SKAMPI based Mid.CBF control/MCS) – NOT STARTED
      Show
      Received, unpacked, installed and test all remaining/outstanding HW equipment except Talon HW (not available) Designed, planned, configured and connected network connections Installed and configured outstanding K8s cluster server with CIS hardened OS and MDA SW stack The following items were not completed due to hardware unavailability and installation delays: Install and configure SKA SW defined architecture on K8s cluster – PARTIALLY COMPLETED Install and configure SKAMPI SW on K8s cluster – NOT STARTED Install, configure and network connect 2 x Talon-LRU HW – NOT STARTED (Talon hardware unavailable) SKAMPI control of 2 x Talon-LRU (via SKAMPI based Mid.CBF control/MCS) – NOT STARTED
    • 15.6
    • Stories Completed
    • PI24 - UNCOVERED

    • Team_CIPA

    Description

      PI15 follow-on from SP-2340 Mid PSI - Finalize HW Procurement, Plan HW deployment, Prepare Facility for AA0.5/1.0

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.deegan Deegan, Miles
                R.Huxtable Huxtable, Robert
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete520.0
                  Total520.0