Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2445

RPS Network design.

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI15
    • None
    • Services
    • Hide

      The networks requirements for Power stations is identified and all relevant stakeholders informed.

      Processes in place to implement any additional equipment/product is in place.

      Show
      The networks requirements for Power stations is identified and all relevant stakeholders informed. Processes in place to implement any additional equipment/product is in place.
    • 1
    • 1
    • Team_SKANET
    • Sprint 5
    • Hide

      Designs produced and workshops held. Reports produced and approved.

      Show
      Designs produced and workshops held. Reports produced and approved.
    • 15.6
    • Stories Completed, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - UNCOVERED

    • Team_SKANET

    Description

      Assess the designs from tenderers and the requirements they have for Networks

      identify any gaps in the current Networks design for these

      Cost and produce the BOM

      identify if an ECP is required for cost changes or design changes.

      Attachments

        Structure

          Activity

            People

              a.schutte Schutte, Adriaan
              j.hammond Hammond, Jill
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 1.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete613.0
                Total613.0

                Dates

                  Created:
                  Updated:
                  Resolved:

                  Structure Helper Panel