Description
With all the changes in design that have occured in the last 12 months and the requirements for capability and functionality of networks being identified in earlier Array Releases than originally stated, a major review of the networks entries in the IPS is required.
This will be informed by a number of other PNET tickets and recent ECPs for both MID and LOW and will require ECP/s to be raised.
All products in all Wps for Both Mid and LOW will need to be reassessed. This will cover implementation tasks s for a number of existing and 'in the pipeline'ECPs.