Assist with implementation of ECP 210115 LOW ITF link to site data

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • None
    • None
    • None
    • Services
    • Hide

      The ECP will be fully costed with a recommended design and an implementation plan to enable it to be presented to TCR and CCB.

      Show
      The ECP will be fully costed with a recommended design and an implementation plan to enable it to be presented to TCR and CCB.
    • Hide

      ITF have a feasible design for their data requirements and a rOM cost of the link.

      Show
      ITF have a feasible design for their data requirements and a rOM cost of the link.
    • Intra Program
    • 2
    • 0
    • PI24 - UNCOVERED

    Description

      Investigate what the exact needs are of the ITF.

      Determine what is the best way t o provide this.

      What the cost of the provision will be.

      If possible implementation of the rlink.

      The LOW System ITF facility needs to be connected to the MRO LOW Site, in order to allow the AIV, ITF and Science Commissioning team members working in the sITF to remotely perform the following activities:

      • System AIV tests on AA0.5/AA1/AA2/AA*
      • Monitoring and controlling site equipment status
      • Uploading and installing SW scripts, patches, updates
      • Downloading test data 

      Additionally, it is important to notice that this ECP is limited to granting access to site for the sITF facility only, it does not cover the need to provide access to site data and equipment to other product suppliers.

      Attachments

        Structure

          Activity

            People

              p.lewis Lewis, Peter
              j.hammond Hammond, Jill
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (0%)

                Feature Estimate: 2.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete00.0
                Total00.0