Continue with the dark fibre procurement: ITT documentation PNET-610

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Must have
    • PI14, PI15
    • None
    • None
    • Services
    • Hide

      Progressing this procurement will enable the SKAO to reserve this critical fibre cable in S.A. to ensure its availability for the project, as it is a highly desirable commodity.

      Show
      Progressing this procurement will enable the SKAO to reserve this critical fibre cable in S.A. to ensure its availability for the project, as it is a highly desirable commodity.
    • Hide

      Networks are ready for CRR.

      Show
      Networks are ready for CRR.
    • Inter Program, Intra Program
    • 3
    • 3
    • 0
    • Team_SKANET
    • Sprint 5
    • Hide

      As per comments below - Dark Fibre has passed through CRR phase and was cleared to progress

      Show
      As per comments below - Dark Fibre has passed through CRR phase and was cleared to progress
    • 15.5
    • Stories Completed, Integrated, Solution Intent Updated, BDD Testing Passes (no errors), Outcomes Reviewed, NFRS met, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI22 - UNCOVERED

    Description

      Maintain the content in ECP 210052. 

      Finalise the ITT document.

      Prepare for the CRR, inc pre-read period, invites, execution, post mtg wash up.

      Attachments

        Issue Links

          Structure

            Activity

              People

                j.hammond Hammond, Jill
                pete.shephard Shephard, Pete [X] (Inactive)
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 3.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete1038.0
                  Total1038.0