Details
-
Feature
-
Must have
-
Obs Mgt & Controls
-
-
-
1
-
2
-
13
-
13
-
Team_MCCS
-
Sprint 4
-
-
-
-
17.5
-
Stories Completed, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
-
-
SYSTEM_DEMO_2 SYSTEM_DEMO_3 Team_MCCS goal_O5 mccs_firmware
-
SPO-2126
Description
Concept design of revised Station beamformer: SP1569.3 SP1569.4 SP1569.5 SP1570.6 SP1570.7
All these features, except SP1569.5, depend on a refactoring of the current station beamformer output stage to support more flexible configuration changes.
A conceptual design phase is required to define a suitable firmware architecture. We expect to define the architecture in PI12 and subsequently lay out a roadmap for the features involved.
UPDATES From PI16 Backlog Refinement: This is now no longer at a Concept Level but actual implementation needed