Details
-
Enabler
-
Not Assigned
-
None
-
Data Processing
-
-
2
-
2
-
5
-
Team_CIPA, Team_SPMT
-
Sprint 5
-
-
-
-
5.4
-
-
Team_CIPA Team_SPMT goal0
Description
This feature is to is ensure documented models of the "Golden" Signal Chain Models are committed into into source code control in such a form that SKA Signal Chain Engineer can run these models and reproduce the results the pre-construction consortia have based their designs on.
Some aspects of this may have been done with Wallace Turner before he left, but this was not handed over to the new Signal Chain Engineer, with the result that the information appears to have been lost. This feature must ensure that this doesn't happen again.