Description
Plan creation of high level design, including Indicative costings.
Identify any gaps and scope timelines.
- Include a Remote Access solution that doesn't use the current solution via Curtin (in conjunction with Richard Schofield who is providing networking in the AARC building)
- Design and cost a potential 100G link to the Pawsey Centre.
- review on-site network inside AAVS, identify missing components
- Representation of the design in Netterrain
AAVS3.0 will be located in an existing remote processing shelter with fibre connectivity to the ASKAP building.
ECP-210104 covers some of this work.
Deadline for completion of the networking is September 2022 (TBC).