ECP200049 analyse NW implications: move LOW CPF to SPC

Details

    • Feature
    • Must have
    • PI13
    • None
    • None
    • Services
    • Hide

      New design agreed and accepted as the new baseline design.
      Uploaded in ALIM.
      Dash 360 updated if necessary
      ICD's agreed and updated where necessary.
      IPS updated.

      Show
      New design agreed and accepted as the new baseline design. Uploaded in ALIM. Dash 360 updated if necessary ICD's agreed and updated where necessary. IPS updated.
    • 2
    • 2
    • 0
    • Overdue
    • PI22 - UNCOVERED

    Description

      To produce a network design based on the movement of the CBF/PSS & PST to the SPC.
      Raise ECP to replace existing baseline design for the CSP-SDP.
      Assess costings submitted for the ECP is still valid - If not raise new ECP to change the costings.
      Re-evaluate the existing IPS for the new design.
      Change any relevant ICDs.

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.deegan Deegan, Miles
                p.lewis Lewis, Peter
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do110.0
                  In Progress   00.0
                  Complete00.0
                  Total110.0