None
-
None
-
Services
-
-
2
-
2
-
0
-
-
Overdue
Description
To produce a network design based on the movement of the CBF/PSS & PST to the SPC.
Raise ECP to replace existing baseline design for the CSP-SDP.
Assess costings submitted for the ECP is still valid - If not raise new ECP to change the costings.
Re-evaluate the existing IPS for the new design.
Change any relevant ICDs.
Attachments
Issue Links
- is cloned by
-
SP-2227 ECP200048 analyse NW implications: move MID CPF to SPC
- Analyzing