Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-2188

Reintroduce end to end tests in skampi

Details

    • Feature
    • Not Assigned
    • PI13
    • None
    • None
    • Services
    • Overdue
    • PI22 - UNCOVERED

    Description

      As new components are introduced into skampi, work needs to be conducted to add appropriate end-to-end tests verifying functionality.

      The following are key considerations:

      1. Tests should pass consistently (at least a 100 times withing stfc back to back)
      2. Synchronicity and correct order of state changes should be focused on
      3. Organisation of tests and their traceability to features/requires/test plans

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.deegan Deegan, Miles
                g.leroux Le Roux, Gerhard [X] (Inactive)
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated: