Review solutions for simple approach to SDP AA0.5 Data Product management, discoverability, and delivery

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Data Processing
    • Hide

      Once we begin running multiple observations & scans with the SDP system at AA0.5 (or possibly before in the PSI and ITF environments) we will need a solution to be able to quickly and easily identify and manage and make available for engineering and commissioning tests a potentially large and growing set of MSs and possibly other data products (QA outputs, calibration solutions etc). 

      As a solution for how this can be done for SDP is yet to be developed we need to start now to get on top of that before too late.

      Show
      Once we begin running multiple observations & scans with the SDP system at AA0.5 (or possibly before in the PSI and ITF environments) we will need a solution to be able to quickly and easily identify and manage and make available for engineering and commissioning tests a potentially large and growing set of MSs and possibly other data products (QA outputs, calibration solutions etc).  As a solution for how this can be done for SDP is yet to be developed we need to start now to get on top of that before too late.
    • Hide
      • Confluence page (or suitable alternative) summarising possible solutions as well as pros/cons of each.
      • Where possible and time allows reviewed solutions could be supported by prototyping or testing code rather than just a pen and paper exercise.
      Show
      Confluence page (or suitable alternative) summarising possible solutions as well as pros/cons of each. Where possible and time allows reviewed solutions could be supported by prototyping or testing code rather than just a pen and paper exercise.
    • Intra Program
    • 2
    • 2
    • 5
    • 2.5
    • Team_NALEDI
    • Sprint 5
    • Hide

      All tasks were completed except for NAL-9, where background information could not be obtained and therefore this ticket was discarded.

      Show
      All tasks were completed except for NAL-9, where background information could not be obtained and therefore this ticket was discarded.
    • 17.5
    • Stories Completed, Outcomes Reviewed, Satisfies Acceptance Criteria, Accepted by FO
    • TEAM_naledi
    • SPO-1581

    Description

      A simple solution is likely all that is needed for AA0.5 something which may only require running any offline engineering and commissioning tests on the same machine as where data is captured. However this work should also include reaching out to the ESCAPEES team, and potentially the wider SRC community, to review leading solutions being developed as these may be able to extend the data delivery, management, and analysis platform beyond the minimal solution needed for AA0.5. For example, this demo might be worth consideration: https://drive.google.com/file/d/1nDDtbXipQeZBiDtN7GVp71NlfVqxYhga/view as would be getting in touch with the ESCAPEEs team to discuss it.

      Attachments

        Issue Links

          Structure

            Activity

              People

                D.Fenech Fenech, Danielle
                b.mort Mort, Ben
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete823.0
                  Total823.0