AA2 Pulsar Timing Beam Recording (limited)

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • AA2 Pulsar Timing (limited)
    • Data Processing
    • 0

    Description

      Feature Set Summary

      By the end of PI27, the goal of this PST Epic is to develop the capability of ingesting and processing 1 or more Pulsar Timing beams, including monitor & control via CSP.LMC. PST will be capable of forming integrated pulse profiles using a system composed of partially-completed versions of the following additional PST components:

      Pulsar Timing Mode (DSP):

      • DSP.CORE.CTRL: add support for the Pulsar Timing mode
      • DSP.CORE.CDD: partially inverts the channelisation performed by the oversampled PFBs produced by the beamformers, performs coherent dedispersion.
      • DSP.CORE.FOLD: folds the signal using a simple phase predictor.
      • DSP.CORE.RPCK: write PSRFITS fold-mode archives to disk

      Output Data transfer (SEND): 

      • SEND.ADD: add support for combining PSRFITS Pulsar Timing files.
      • SEND.XFER: add support for transferring Pulsar Timing output products to SDP.

      External Simulator (SIM):

      • SIM.SDP: simulates SDP output interface for Pulsar Timing mode, when SDP is absent

      TANGO devices required for

      • MGMT.DSP: adding Pulsar Timing support 
      • MGMT.SIM: adding Pulsar Timing support
      • MGMT.SEND: add Pulsar Timing support

       

      Attachments

        Structure

          Activity

            People

              A.Noutsos Noutsos, Aristeidis
              A.Noutsos Noutsos, Aristeidis
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Dates

                Created:
                Updated:

                Structure Helper Panel