      The deployment of MCCS software onto AAVS will provide stakeholders with reassurances that the software is progressing toward the desired end goal of being deployed on LFAA as we progress through the AA.xx gates. Early deployments will allow any issues in the MCCS software to be identified early on and corrective action taken.

      Show
      The deployment of MCCS software onto AAVS will provide stakeholders with reassurances that the software is progressing toward the desired end goal of being deployed on LFAA as we progress through the AA.xx gates. Early deployments will allow any issues in the MCCS software to be identified early on and corrective action taken.
    • Hide

      A plan for deployment to an AAVS system has been prepared and presented to relevant stakeholders.
      The plan presented has been agreed upon by all relevant stakeholders
      The plan presents a recommendation of what the initial deployment should be and why it would be desirable.

      Show
      A plan for deployment to an AAVS system has been prepared and presented to relevant stakeholders. The plan presented has been agreed upon by all relevant stakeholders The plan presents a recommendation of what the initial deployment should be and why it would be desirable.
    • 2
    • 2
    • 20
    • 10
    • Team_MCCS
    • Sprint 5
    • Hide

      At present the command flows from the upper levels of MCCS down to the hardware are mostly unimplemented. As we will soon need some degree of control and monitoring (for demonstrations during this PI and actual deployed field operations during PI13) it is important that we:

      Assess what are the gaps
      Make a plan in respect of filling the gaps
      Start implementing code to fill some of these gaps (particularly in support of PI12 demos).
      There are several control flows to consider, for example:

      • Configure
      • Scan

      Scan, for example, receives a JSON string specifying configuration parameters for a multiplicity of subarray beams. Currently this does nothing, but we will need to to slice out the parameters for each subarray beam, passing each of them through a Tango command interface to the corresponding SubarrayBeam device. In turn, each of these will convey configuration information to apply to the contributing station beams, which must therefore be passed down to each corresponding StationBeam device. In turn these affect the configuration of the stations touched by each beam, so a StationBeam -> Station and a Station -> Tile configuration interface is needed.

      Implementing any of these, or similarly for other command flows, would be a useful step towards the final goal.

      So, having conducted an audit of the required additions we will prioritize them and make an implementation plan.

      If we can choose implementation work that would lend itself to demonstration of command flow using a Taranta dashboard that would be immediately applicable to a PI12 MCCS demo. Ideally this would demonstrate flow to hardware, but flow short of this would still be very useful. We aim, in particular, to demonstrate the effectiveness of the long-running command implementation for Tile initialization. This work is likely related, but may simply refer to On/Off commands, for example, rather than Configure.

      It should be noted that further work on resource management (MCCS-403, MCCS-405) will be required before some of this work can be completed.

      Some work on this feature has been accomplished but significant tickets remain to be rolled over to PI13.
      The team intends to workshop how to divide the tickets into essential and deferrable and transfer these to new features.
      However, the stated objective of this feature - developing a plan, is formed from the identified teickets and this should be able to be documented & closed.
      DEvelopment of detailed implementation and deployment plans follows from this.

      The focused tickets to facilitate the deployment on AAVS will be contained in SP-2073.

      Show
      At present the command flows from the upper levels of MCCS down to the hardware are mostly unimplemented. As we will soon need some degree of control and monitoring (for demonstrations during this PI and actual deployed field operations during PI13) it is important that we: Assess what are the gaps Make a plan in respect of filling the gaps Start implementing code to fill some of these gaps (particularly in support of PI12 demos). There are several control flows to consider, for example: Configure Scan Scan, for example, receives a JSON string specifying configuration parameters for a multiplicity of subarray beams. Currently this does nothing, but we will need to to slice out the parameters for each subarray beam, passing each of them through a Tango command interface to the corresponding SubarrayBeam device. In turn, each of these will convey configuration information to apply to the contributing station beams, which must therefore be passed down to each corresponding StationBeam device. In turn these affect the configuration of the stations touched by each beam, so a StationBeam -> Station and a Station -> Tile configuration interface is needed. Implementing any of these, or similarly for other command flows, would be a useful step towards the final goal. So, having conducted an audit of the required additions we will prioritize them and make an implementation plan. If we can choose implementation work that would lend itself to demonstration of command flow using a Taranta dashboard that would be immediately applicable to a PI12 MCCS demo. Ideally this would demonstrate flow to hardware, but flow short of this would still be very useful. We aim, in particular, to demonstrate the effectiveness of the long-running command implementation for Tile initialization. This work is likely related, but may simply refer to On/Off commands, for example, rather than Configure. It should be noted that further work on resource management (MCCS-403, MCCS-405) will be required before some of this work can be completed. Some work on this feature has been accomplished but significant tickets remain to be rolled over to PI13. The team intends to workshop how to divide the tickets into essential and deferrable and transfer these to new features. However, the stated objective of this feature - developing a plan, is formed from the identified teickets and this should be able to be documented & closed. DEvelopment of detailed implementation and deployment plans follows from this. The focused tickets to facilitate the deployment on AAVS will be contained in SP-2073 .
    • 13.6
    • Stories Completed, Outcomes Reviewed, Accepted by FO
    • PI22 - UNCOVERED

    • MCCS_firmware mccs_software

    Description

      There has been much effort in the past 4 PIs to bridge the gaps between the requirements of the MCCS software and that which exists and has been demonstrated to work successfully for AAVS. However as we draw closer towards deploying MCCS on AAVS there is a need to understand and plan for any of the remaining implementation gaps. By the start of PI13 the project, and more specifically MCCS, needs to know what is missing in the MCCS implementation which would prevent successful deployment on AAVS. From this analysis a scope of work (for PI13 planning) is prepared.

      Attachments

        Issue Links

          Structure

            Activity

              People

                a.bridger Bridger, Alan
                r.braddock Braddock, Ralph
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete717.0
                  Total717.0