  2. SP-1912

Enable support for product testing with multiple FDAS beams simultaneously in ProTest

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Data Processing
    • Hide

      TBD

      Show
      TBD
    • Hide

      TBD

      Show
      TBD
    • Hide

      Insert links to relevant docs/code here

      Show
      Insert links to relevant docs/code here
    • PI24 - UNCOVERED

    • Team_PSS

    Description

      The Cheetah pipeline will eventually be running using multiple FDAS beams simultaneously. This feature will implement functionality to enable multiple simultaneous beams to be tested within the end-to-end testing framework. 

      Attachments

        Issue Links

          Structure

            Activity

              People

                A.Noutsos Noutsos, Aristeidis
                L.Levin-Preston Levin-Preston, Lina
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0