    • Obs Mgt & Controls
    • Hide

      The benefit of this approach is to identify content to be displayed on the  AA0.5 dashboard, create a design, showcase Taranta functionality, identify its limitations, identify missing features and functions. 

      Generate design for a non-trivial dashboard which can be used as a basis for development of  the detailed subsystem dashboard and provides an example of a Taranta dashboard which implements design guidelines and  recommendations (result of PI11 work on SP-xxx).

      Show
      The benefit of this approach is to identify content to be displayed on the  AA0.5 dashboard, create a design, showcase Taranta functionality, identify its limitations, identify missing features and functions.  Generate design for a non-trivial dashboard which can be used as a basis for development of  the detailed subsystem dashboard and provides an example of a Taranta dashboard which implements design guidelines and  recommendations (result of PI11 work on SP-xxx).
    • Hide

      OLD [Design and mock a dashboard showing overview of the MID Telescope. 

      The stretch goal:  overview of the LOW Telescope. ]

      Timeboxed study with the main goal of understanding how control / monitoring UIs could be defined with Taranta dashboards.

      To connect with MVP devices is not required (would be a plus), we may make use of test devices to allow for running the dashboard.
      Summary of the study will be available on confluence.
      If time allows for it, some initial mockups to set the basis towards an engineering dashboard for AA0.5 are available as a project in Balsamiq. Those mockups can be low-fidelity wireframes if not enough information is available at the present time. 

       

       

      Show
      OLD [Design and mock a dashboard showing overview of the MID Telescope.  The stretch goal:  overview of the LOW Telescope. ] Timeboxed study with the main goal of understanding how control / monitoring UIs could be defined with Taranta dashboards. To connect with MVP devices is not required (would be a plus), we may make use of test devices to allow for running the dashboard. Summary of the study will be available on confluence. If time allows for it, some initial mockups to set the basis towards an engineering dashboard for AA0.5 are available as a project in Balsamiq. Those mockups can be low-fidelity wireframes if not enough information is available at the present time.     
    • 1
    • 1
    • 20
    • 20
    • Team_CREAM
    • Sprint 5
    • Hide

      The work done in the context of this study is described on the following confluence page

      The balsamic project can be found at the following link. Wireframes are also attached as a pdf file. SP-1808_wireframes.pdf 

      Show
      The work done in the context of this study is described on the following confluence page The balsamic project can be found at the following link . Wireframes are also attached as a pdf file.  SP-1808_wireframes.pdf  
    • 13.6
    • Stories Completed, Outcomes Reviewed, Satisfies Acceptance Criteria, Accepted by FO
    • Taranta Team_CREAM

    Description

      The goal of this feature is to design a graphical user interface which provides overview of the MVP status, including status of the subsystems, with a goal to design a dashboard  which can be used by testers and developers.  The goal is to create display for the system implementing AA 0.5  functionality.

      The GUI should provide all relevant information required to asses the status of the system and its subsystems,  including subarrays, status of on-going observations (SBs and scans).

      More than one view may be required to show all aspects of the MVP.

      The goal is to identify the content, design the GUI, and if possible create a Taranta dashboard. This work may generate additional requirements for the Taranta framework, which then can be placed on the roadmap and assigned priorities.

      Ideally, the GUI would provide access to the Alarm Display, EDA, logs (sysystem logs, central log repository), which at this time is not possibile. 

      Ability to display local logs should be considered.

      If possible, differences between Low and Mid Telescopes and various facilities should be identifie (MVP software only, PSI Low, PSI Mid, etc.).

      Attachments

        Issue Links

          Structure

            Activity

              People

                s.vrcic Vrcic, Sonja
                s.vrcic Vrcic, Sonja
                Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete813.5
                  Total813.5