Details

    • Obs Mgt & Controls, Services
    • Hide

      The purpose of the EDA is to provide timestamped historical record  which can be used to support development, testing, integration, commissioning and trending analysis.  Early deployment at the PSI will support early integration and allow for development of better analysis tools.

      Show
      The purpose of the EDA is to provide timestamped historical record  which can be used to support development, testing, integration, commissioning and trending analysis.  Early deployment at the PSI will support early integration and allow for development of better analysis tools.
    • Hide

      EDA can be deployed both as part of and independently from the SKA_MVP, and persisted at the LOW PSI.

      MVP software can be deployed, started and shutdown independently from the EDA.

       

      Show
      EDA can be deployed both as part of and independently from the SKA_MVP, and persisted at the LOW PSI. MVP software can be deployed, started and shutdown independently from the EDA.  
    • 2
    • 13
    • 6.5
    • 15.5
    • PI22 - UNCOVERED

    Description

      Engineering Data Base (EDA) is one of the key components of the Control System, and is required early in the development cycle to support testing, debugging, integration, commissioning, trending analysis and more.

      EDA shall be deployed in all deployment environments (SKAMPI, PSIs, ITFs).  

      It should be possible to deploy EDA independently from other software subsystems, persist the content while the rest of software may be shutdown, re-deployed and restarted.  Users should be able to access EDA content at any time.

       

      PI10 work on EDA, see the NCRA presentation provided in comments (dated 2 Feb 2021)

      https://confluence.skatelescope.org/display/SWSI/EDA+deployment+within+SKAMPI

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                a.bridger Bridger, Alan
                s.vrcic Vrcic, Sonja
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 2.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel