Implement MCCS control of data capture from TPM

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Obs Mgt & Controls
    • Hide

      Prepares for support of testing data-stream interface to CSP

      Provides data capture capability to enable hardware testing of beamforming, signal chain perferformance

      Prerequisite for deployment to AAVS demonstrator, impementation of monitor and calibration systems.

      Show
      Prepares for support of testing data-stream interface to CSP Provides data capture capability to enable hardware testing of beamforming, signal chain perferformance Prerequisite for deployment to AAVS demonstrator, impementation of monitor and calibration systems.
      • DAQ  data capture module integrated into MCCS release
      • Test hook added to tile simulator (models simulation of data capture)
      • Demonstrate data capture on hardware at INAF or PSI.
    • 5
    • 3.2
    • 11.5
    • PI22 - UNCOVERED

    Description

      IMplement and test support for data capture from TPM to disk file on MCCS server.

      Follows on/extends the implementation of Configure/scan to trigger a data output stream for offline analysis.

      DAQ module for streaming data from TPM to local file exists from AAVS; need to analyze and import this module to the MCCS package. An initial decision is needed on how to manage file names, start and stop capture inside of MCCS structure.
      Tile Simulator should recognize connection to DAQ, generate synthetic data if possible.
      Tile device should implement commands to control hardware capture.

      Attachments

        Issue Links

          Structure

            Activity

              People

                a.bridger Bridger, Alan
                r.braddock Braddock, Ralph
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0