Description
Updates for PI10:
A lot of bugs are either not reproducible based on the updates to the MVP or have been fixed. However as a result of the extensive testing done, especially by Peter Wortmann new SKB tickets have been reported and the high priority ones must be fixed and as many of the medium priority ones as possible. This is also documented in the MVP Slack channel
This is cloned from SP-1408 which had a wider and open ended scope originally in PI9 and the same was descoped and made specific to SKB14 and follow on carried over to this Feature
As the MVP has grown significant functionality has been added. However it is likely that significant vulnerabilities may exist, including intermittently occurring bugs due to race conditions etc. SKB13 and SKB14 which are under analysis are recent ones.
The goal of this enabler is to analyse for any shortcomings, including the outcomes from the post mortem of earlier bugs, improve the testing to ensure that we can detect more vulnerabilities that exist; and to refactor or bug fix as needed with the goal of improving the robustness of the MVP.
This is expected to be an ongoing exercise across the next few PIs For PI9 we would like to time-box this to about 5 FPs and address the outcomes from SKB13 and 14 plus the first cases of test cases and fixes.
Attachments
Issue Links
- clones
-
SP-1408 Detect and address MVP vulnerabilities - Stage 1
- Done
- is cloned by
-
SP-1689 Detect and address MVP vulnerabilities - Stage 3 (Clones SP-1488)
- Done