Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1468

Networks rollout plan AA0.5 for LOW

Details

    • Enabler
    • Could have
    • PI10, PI13
    • None
    • None
    • Services
    • Hide

      <TODO>

      Show
      <TODO>
    • Hide

      Each release should be represented in Netterrain.
      Any lightweight documentation should be included with the feature.
      A high level Bill of Materials for each release should be documented.

      Show
      Each release should be represented in Netterrain. Any lightweight documentation should be included with the feature. A high level Bill of Materials for each release should be documented.
    • 3.5
    • 11.429
    • Sprint 5
    • Overdue
    • PI22 - UNCOVERED

    Description

      This should include a the network design, rack layout and high level Bill of Materials and technical specifications.

      Attachments

        Issue Links

          Structure

            Activity

              People

                j.hammond Hammond, Jill
                p.lewis Lewis, Peter
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 3.5

                  IssuesStory Points
                  To Do1629.0
                  In Progress   00.0
                  Complete00.0
                  Total1629.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel