Test 100G interface to CSP on the PSI hardware platform

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • Won't have (this time)
    • PI15
    • None
    • Obs Mgt & Controls
    • Hide

      Provides early opportunity to confirm basic compatibility between SPS and CSP under control of MCC.  The 100G network interface is the subject of a recently agreed ECP and is a basic prerequisite for integration of MCCS/SPS and CSP/CBF.

      Show
      Provides early opportunity to confirm basic compatibility between SPS and CSP under control of MCC.  The 100G network interface is the subject of a recently agreed ECP and is a basic prerequisite for integration of MCCS/SPS and CSP/CBF.
    • 5
    • 1
    • Overdue
    • PI22 - UNCOVERED

    Description

      Prepare for delivery of TPM1.6 in Q2, 21 including configured 100G switch, power and cooling control (at least check its on) and updated Tile device driver.
      (Initial test can could hack existing AAVS scripts using TPM1.2, so may not be so much dev work but do need QA (DoD) work on that)

      Developing Tests strategy and concepts

      Include rich colaboration with MCCS firmware team, Perentie and Team Viola to prepare and execute this.
      *possibly want to invite networks/Platform (PLANET) to help observe/document (only) this test?  Deegan, Miles Lloyd, Samantha Lewis, Peter Hammond, Jill

      Attachments

        Issue Links

          Structure

            Activity

              People

                b.mort Mort, Ben
                r.braddock Braddock, Ralph
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 5.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates