Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1249

Instantiate, run and stop PSS pipeline using LMC (Cheetah part)

Details

    • Feature
    • Not Assigned
    • PI8
    • COM PSS SW
    • None
    • Data Processing
    • Hide

      With SP-1297 introduces an initial, rudimentary capability to manage and control the PSS MVP Cheetah pipeline.

      Show
      With SP-1297 introduces an initial, rudimentary capability to manage and control the PSS MVP Cheetah pipeline.
    • Hide

      Given - PSS MVP pipeline process is required

      When - PSS LMC commands the Cheetah pipeline process to run

      Then - Cheetah correctly interacts with the PSS LMC to successfully control and monitor the setting up, running and stopping of the pipeline process

       

      Show
      Given  - PSS MVP pipeline process is required When  - PSS LMC commands the Cheetah pipeline process to run Then  - Cheetah correctly interacts with the PSS LMC to successfully control and monitor the setting up, running and stopping of the pipeline process  
    • 1
    • 2
    • 10
    • Team_PSS
    • Sprint 5
    • Hide

      Insert relevant links to docs and/or code here:
      See comments in AT4-340 and AT4-342

      Show
      Insert relevant links to docs and/or code here: See comments in AT4-340 and AT4-342
    • 8.6
    • Outcomes Reviewed, Accepted by FO
    • PI22 - UNCOVERED

    Description

      Implements the capability to trigger pss pipeline to receive, process and export data to the SDP using LMC flags for at least one subarray.

      Attachments

        Issue Links

          Structure

            Activity

              People

                A.Noutsos Noutsos, Aristeidis
                m.pearson Pearson, Mike [X] (Inactive)
                Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete26.0
                  Total26.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel