Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1087

Investigate adding a 1GB Ethernet Connection to LFAA SPS Network (SP-774, continued)

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Spike
    • Not Assigned
    • None
    • None
    • None
    • Services
    • Hide

      Close off investigation begun in SP-774 so that an ECP can be raised which addresses several network related concerns asĀ outlined in TIMN-176.

      Show
      Close off investigation begun in SP-774 so that an ECP can be raised which addresses several network related concerns asĀ outlined in TIMN-176.
    • Hide

      <TODO!>

      Show
      <TODO!>
    • 0.5
    • 22

    Description

      Complete 'Further work and outstanding issues' as described in the report produced for SP-774 'Investigate adding a 1GB Ethernet Connection to LFAA SPS Network':

      • Check that a 1GE connection from CMB (what does CMB stand for) is available; the SPS Detailed Design Document mentions a 10GE is used to connect the monitor and control data to the LFAA 100GE network?
      • Check LMC traffic capacity calculations, and confirm that NSDN has enough bandwidth to support the additional services.
      • Check the LFAA network logical network design and configuration for the LMC services e.g. network addressing schemes. Note that the LFAA logical network design and configuration is a bigger task than covered by this TIMS ticket.

      In addition, the following concern from G. Comoretto should also be addressed:

      "I am a bit perplexed. This means that the MCCS control network has to be integrated with SaDT NSDN system. I would feel safer if the two systems are segregated, to limit the possibility of fault propagation. MCCS 1G network and the master MCCS node are also protected by UPS and designed as high availability. But your network experts are surely more expert than me, and it is good to have an homogeneous network architecture."

      This should be done in consultation with m.waterson who has also looked into these points.

      If in addressing these questions no showstoppers are discovered, an ECP should be proposed that captures the results of SP-774 combined with this ticket.

      Attachments

        Issue Links

          Structure

            Activity

              People

                b.mort Mort, Ben
                d.hayden Hayden, Daniel
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.5

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel