Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-100

RFI mitigation and test vectors

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Feature
    • None
    • COM PST SW
    • None
    • Obs Mgt & Controls
    • Hide

      Measure the effectiveness of the existing algorithm on RFI affected and RFI clean data. Demonstrate that the algorithms specified in the design meet the Level 3 requirements for RFI mitigation and flagging.

      Show
      Measure the effectiveness of the existing algorithm on RFI affected and RFI clean data. Demonstrate that the algorithms specified in the design meet the Level 3 requirements for RFI mitigation and flagging.
    • 7
    • 1.857
    • 20.2
    • PI24 - UNCOVERED

    Description

      Acquire RFI Test Vectors from the SKAO or consider using RFI affected data from precursor telescopes. Evaluate the RFI mitigation algorithm in the PST prototype and design against the RFI environment. Develop alternate RFI mitigation techniques if necessary.

      Attachments

        Issue Links

          Structure

            Activity

              People

                A.Noutsos Noutsos, Aristeidis
                a.jameson Andrew Jameson
                Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 7.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:
                    Resolved:

                    Structure Helper Panel