Cape Town Office Commissioning

Change Owns to Parent OfsSet start and due date...
    XporterXMLWordPrintable

Details

    • Enabler
    • Must have
    • PI16
    • None
    • Services
    • Hide

      SKAO staff in South Africa can access the internet and internal services they need to do their jobs.

      Show
      SKAO staff in South Africa can access the internet and internal services they need to do their jobs.
    • Hide
      • internet access in the new office environment
      • one meeting room set up for video conferencing
      • Host for VMs set up and commissioned
      • VM for Domain Controller exists and can be used
      • follow-up work for PI16 identified.
      Show
      internet access in the new office environment one meeting room set up for video conferencing Host for VMs set up and commissioned VM for Domain Controller exists and can be used follow-up work for PI16 identified.
    • 3
    • 3
    • 0
    • Team_IT
    • Sprint 5
    • Hide

      All criteria met.

      Show
      All criteria met.
    • 16.6
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO
    • PI24 - UNCOVERED

    • Team_IT

    Description

       New Cape Town office needs to be set up. Move-in date ~15 November 2022. In addition to general office requirements (desk systems, network, printing etc):

      Need to set up a meeting room with video conferencing facilities.

      Need to build a VM Host and commission it.

      Need to place a Domain Controller VM somewhere.

       

      The aim for this PI is to set up basic services: there will be follow-up work in following PIs to set up more meeting rooms, improve services, get a proper server room set up etc.

      Attachments

        Structure

          Activity

            People

              r.schofield Schofield, Richard
              r.schofield Schofield, Richard
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 3.0

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete626.0
                Total626.0