Facilitate and align activities to achieve end-to-end user test from OET to SDP on PSI Low k8s cluster

Details

    • Feature
    • Not Assigned
    • PI9
    • None
    • None
    • Services
    • Hide

      Multiple teams need to participate in providing both software and hardware for the OET to SDP end-to-end test. Without this Feature, that end-to-end test would be impeded, or severely limited.

      Show
      Multiple teams need to participate in providing both software and hardware for the OET to SDP end-to-end test. Without this Feature, that end-to-end test would be impeded, or severely limited.
    • Hide
      • Define the BDD end-to-end test and translate this into a suitable series of commands in a Jupyter notebook, or a Gherkin test.
      • Facilitate alignment between the other teams involved in this Objective (Buttons, Cream, Yanda, SSMT) to ensure the SW developed by each is mutually consistent.
      • Work with SSMT (Gerhard Le Roux) to ensure that SKAMPI can be integrated and run on the PSI Low k8s cluster.
      • Ensure that VIOLA is able to remotely access both the Jupyter notebook interface and an interface to SDP.
      • Appropriately elevate and mitigate, if possible, any risks to the completion of the Objective that arise from factors outside VIOLA's control.
      • Step-by-step testing procedure documented as a lightweight document.
      • Execution of the test.
      Show
      Define the BDD end-to-end test and translate this into a suitable series of commands in a Jupyter notebook, or a Gherkin test. Facilitate alignment between the other teams involved in this Objective (Buttons, Cream, Yanda, SSMT) to ensure the SW developed by each is mutually consistent. Work with SSMT (Gerhard Le Roux) to ensure that SKAMPI can be integrated and run on the PSI Low k8s cluster. Ensure that VIOLA is able to remotely access both the Jupyter notebook interface and an interface to SDP. Appropriately elevate and mitigate, if possible, any risks to the completion of the Objective that arise from factors outside VIOLA's control. Step-by-step testing procedure documented as a lightweight document. Execution of the test.
    • 2.5
    • 2.5
    • 3.2
    • Team_SSMT, Team_VULCAN
    • Sprint 5
    • Hide

      1. See Lightweight document to describe the process that was followed to be able to perform the test (SKA-TEL-SW-0000047) : https://docs.google.com/document/d/1rrRQxB9BzAmXfSnRSkRA3Z6Rtel8ZeOuB3jIz4Iqk6Q/edit?pli=1#
      2. SPO-944 demo, Sequence and SUT diagrams: https://drive.google.com/drive/folders/1uNGVfD76EBLMe4Vqt3L0k605avy__Vow
      3. The Notebook that was used in the demo: can be found in the following link: https://drive.google.com/drive/folders/1uNGVfD76EBLMe4Vqt3L0k605avy__Vow

      Show
      1. See Lightweight document to describe the process that was followed to be able to perform the test (SKA-TEL-SW-0000047) : https://docs.google.com/document/d/1rrRQxB9BzAmXfSnRSkRA3Z6Rtel8ZeOuB3jIz4Iqk6Q/edit?pli=1# 2. SPO-944 demo, Sequence and SUT diagrams: https://drive.google.com/drive/folders/1uNGVfD76EBLMe4Vqt3L0k605avy__Vow 3. The Notebook that was used in the demo: can be found in the following link: https://drive.google.com/drive/folders/1uNGVfD76EBLMe4Vqt3L0k605avy__Vow
    • 10.1
    • Stories Completed, Integrated, Outcomes Reviewed, Demonstrated, Satisfies Acceptance Criteria, Accepted by FO

    Description

      This Feature should cover the work required by VIOLA team to satisfy the key results of the shared Objective SPO-944.

      Attachments

        Issue Links

          Structure

            Activity

              People

                j.santander-vela Santander-Vela, Juande
                d.hayden Hayden, Daniel
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 2.5

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete316.0
                  Total316.0