PSI Low - finalise configuration and process for managing it

Details

    • Feature
    • Not Assigned
    • PI9
    • None
    • None
    • Services
    • Hide
      • Diagram showing PI#9 physical configuration, showing all interconnected HW, down to the level of servers, switches, boards, etc, and distinguishing between data and control paths)
      • Database showing PI#9 total configuration (HW and SW). For each item, it should include information relevant to the configuration, including: description, multiplicity, version, fault status / exceptions, IP addresses, operating systems, etc.
      • Same as above two bullets but showing projected configuration for PI#10 and PI#11. This should be adapted from the above two bullets, showing the 'delta'.
      • Lightweight CM process such that SAFe teams can update the PSI Low configuration themselves. The database should be part of the Solution Intent and made visible to the SAFe teams developing SW for PSI Low.
      Show
      Diagram showing PI#9 physical configuration, showing all interconnected HW, down to the level of servers, switches, boards, etc, and distinguishing between data and control paths) Database showing PI#9 total configuration (HW and SW). For each item, it should include information relevant to the configuration, including: description, multiplicity, version, fault status / exceptions, IP addresses, operating systems, etc. Same as above two bullets but showing projected configuration for PI#10 and PI#11. This should be adapted from the above two bullets, showing the 'delta'. Lightweight CM process such that SAFe teams can update the PSI Low configuration themselves. The database should be part of the Solution Intent and made visible to the SAFe teams developing SW for PSI Low.
    • 1.75
    • 14.857
    • Team_VULCAN
    • Sprint 5
    • Hide

      A confluence page was created. It contain the tables of the components and block diagrams for PI9 and PI10/11.
      https://confluence.skatelescope.org/display/SE/SKA+Low+PSI+Configuration+Management

      (The page need to be checked by the MCCS and Parentie teams)

      Show
      A confluence page was created. It contain the tables of the components and block diagrams for PI9 and PI10/11. https://confluence.skatelescope.org/display/SE/SKA+Low+PSI+Configuration+Management (The page need to be checked by the MCCS and Parentie teams)
    • 19.6

    Description

      • Record the PSI Low configuration (HW and SW) for PI9, and also the projected configuration for PI10 and PI11.
      • Create a lightweight Configuration Management (CM) process so that SAFe teams can update the PSI Low configuration themselves whenever a new HW, SW or FW version is installed in the PSI or available to use in the PSI.

       

      Attachments

        Structure

          Activity

            People

              j.santander-vela Santander-Vela, Juande
              d.hayden Hayden, Daniel
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Feature Progress

                Story Point Burn-up: (100.00%)

                Feature Estimate: 1.75

                IssuesStory Points
                To Do00.0
                In Progress   00.0
                Complete311.0
                Total311.0