      Potentially reduces size and cost of the SKA science data processor by removing the need to store and/or process data at full resolution by moving operations that require full resolution to the network.

      Show
      Potentially reduces size and cost of the SKA science data processor by removing the need to store and/or process data at full resolution by moving operations that require full resolution to the network.
    • Hide

      Confluence page describing initial investigation of the possible application of in-network computing in SKA SDP

      • application analysis
      • technology exploration (with timelines for hardware availability)
      • description of prototyping to be done, including potential features for future PIs)
      Show
      Confluence page describing initial investigation of the possible application of in-network computing in SKA SDP application analysis technology exploration (with timelines for hardware availability) description of prototyping to be done, including potential features for future PIs)
    • 1
    • 1
    • 3
    • Team_PLANET
    • Sprint 4
    • Show
      https://confluence.skatelescope.org/pages/viewpage.action?pageId=127505595
    • 9.6
    • Stories Completed, Outcomes Reviewed, Satisfies Acceptance Criteria, Accepted by FO

    Description

      Programmable network devices, both NICs as well as switches, are becoming more available. This may allow signal processing of data as it arrives in the SKA science data processor. Investigate whether this is viable.

       

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.bartolini Bartolini, Marco
                c.broekema Chris Broekema
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete37.0
                  Total37.0

                  Dates

                    Created:
                    Updated:
                    Resolved: