Uploaded image for project: 'SAFe Program'
  1. SAFe Program
  2. SP-1221

Assess RDMA work to date and submit an ECP if appropriate

Details

    • Spike
    • Not Assigned
    • PI8
    • None
    • None
    • Services
    • Hide

      <TODO!>

      Show
      <TODO!>
    • Hide

      Capability/Feature planned for PI9 to write a report and either start ECP or curtail RDMA work.

      All potentially affected teams contacted: CIPA, Perentie, Spaza, SDP, NZAPP, Planet.

      Information required for report clearly defined in the capability/feature description.

      Show
      Capability/Feature planned for PI9 to write a report and either start ECP or curtail RDMA work. All potentially affected teams contacted: CIPA, Perentie, Spaza, SDP, NZAPP, Planet. Information required for report clearly defined in the capability/feature description.
    • 0.5
    • 0.5
    • 30
    • Team_PLANET
    • Sprint 5
    • Overdue
    • SPO-726

    Description

      Prepare a feature for next PI to bring the RDMA (HW/SW) vs. io_uring vs. baseline debate to a close and start the process of changing the design through an ECP if needed.

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.bartolini Bartolini, Marco
                m.deegan Deegan, Miles
                Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (0%)

                  Feature Estimate: 0.5

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete00.0
                  Total00.0

                  Dates

                    Created:
                    Updated:

                    Structure Helper Panel