      Having the CBF, PSS and PST moved into the SPC can present a number of advantages from an hardware maintanance and operations point of view.

      Part of the assessment for this ECP is also leading to a more decoupled architecture, less reliant on time synchronisation and more robust to errors in estimates in space, power and computing.

      This Feature intends to deliver a complete analysis of the related ECP-190009 up to the point where the ECP is split into two separate ECPs, one for each telescope, and submitted to the CCB.

      Show
      Having the CBF, PSS and PST moved into the SPC can present a number of advantages from an hardware maintanance and operations point of view. Part of the assessment for this ECP is also leading to a more decoupled architecture, less reliant on time synchronisation and more robust to errors in estimates in space, power and computing. This Feature intends to deliver a complete analysis of the related ECP-190009 up to the point where the ECP is split into two separate ECPs, one for each telescope, and submitted to the CCB.
    • Hide

      ECP assessment delivered in Confluence

      ECP assessment presented to the CCB

      Show
      ECP assessment delivered in Confluence ECP assessment presented to the CCB
    • 1
    • 1
    • 40
    • Team_PLANET
    • Sprint 5
    • Overdue
    • PI22 - UNCOVERED

    • SPO-726

    Description

      Coordinate and contribute to the work required to finalise conclusions on the pros and cons of moving CBF, PSS and PST systems to the SPC (ECP-190009).

      Attachments

        Issue Links

          Structure

            Activity

              People

                m.bartolini Bartolini, Marco
                m.deegan Deegan, Miles
                Votes:
                0 Vote for this issue
                Watchers:
                0 Start watching this issue

                Feature Progress

                  Story Point Burn-up: (100.00%)

                  Feature Estimate: 1.0

                  IssuesStory Points
                  To Do00.0
                  In Progress   00.0
                  Complete59.0
                  Total59.0